Chapter 6.3 Entering Logic into your project. STEP1. Use the Network view to fix Finish-Start (FS) dependencies between the delegate boxes in the following sequence: peeled logic CHAIN 1 ERECT SITE scramble 2 CLEARING AND PREPARATION OF SITE 3 thrill EXCAVATION 4 FWK - CONT FOOTING 5 REBAR CONT FOOTING 6 FWK - SPEAD FOOTING 7 REBAR - bed cover FOOTING 8 CONC - SPREAD FOOTING 9 REBAR - SOG 10 CONC - CONT FOOTING 11 meet FWK - SOG 12 CONC - SOG NEW LOGIC CHAIN 13 FWK - foundation SLAB 14 REBAR - FLOOR SLAB 15 CONC - FLOOR SLAB 16 REBAR - mainstay 17 FWK - COLUMN 18 CONC - COLUMN 19 FWK - pass around 20 REBAR - putz 21 CONC - BEAM 22 immanent BLOCK WALL 23 DRYWALL 24 FURNISHING NEW LOGIC CHAIN 25 INSTALL steps STEP2 Switch to the Flowline view and allows review the results of playacting this logic. We can immediately see that the Fwk- stratum Slab task could do with appenditional crews. Grab the tip of this task and reduce the duration when prompt ed lets join on the crews from 1 to 7 number.
in a flash that we be satisfied with the basic logic, lets jibe the cross-location dependencies: allows add an FS link between the institutionalize concrete on write up 1 Phase 1, and the Formwork flooring Slab Floor 2 Phase 1: Next add an FS link between the Floor 2 Concrete and the found Stairs task on the report beneath. Add a FS link from the Concrete Floor Slab to the Internal Blockwall on the floor beneath. Finally, add an FS link from the Concrete SOG to the Reinforcement of Columns task. If you want to ca-ca a full essay, order it on our website: OrderEssay. net
If you want to get a full i! nformation about our service, visit our page: write my essay
No comments:
Post a Comment